Ukraine should develop biofuel boiler houses and biogas power stations

Review of the Bioenergy Sector of Ukraine with Comments and Explanations from the Chairman of the Board of the Bioenergy Association of Ukraine – Georgii Geletukha –

You can read in the interview for the "Energy reform" project by the link below.

In the interview You can find more information about:

  • the largest biogas plants projects in Ukraine
  • use of bio residues
  • bioenergy projects financing
  • bio Power stations maneuverability
  • green tariffs, auctions and more...

Quote from the article:

"Over the last 7-8 years, the bioenergy industry in Ukraine, according to the State Statistics Service, is growing annually by 35%. In 2017, bioenergy has replaced 3.8 billion cubic meters of natural gas (in 2017 bioenergy replaced 3.5 billion cubic meters). To replace such amount of natural gas it is needed 5 thousand MW of biomass heat capacity. Roughly half of these capacities are installed in the private sector, and the rest – in the industry".

Read the full interview here (in Ukrainian):

Georgii Geletukha: Ukraine should develop a biofuel boiler houses and biogas power stations (interview), Electronic edition "Reform.energy", January 22, 2019

Source: http://uabio.org/en/mass-media/3829-reform-energy-interview-bioenergy-biogas-ukraine

See also:

Presentation of the UABio Head of the Board Georgii Geletukha at the "RENPOWER 2019" Conference

Chairman of the Board of the Bioenergy Association of Ukraine – Georgii Geletukha
Beeld: ©Bioenergy Association of Ukraine